Work / Case 02 · ZYOD (ERP)

TNA mobile activity cards

I turned a planner's desktop table into a mobile card for factory-floor teams. 100% adoption across all 3 launch factories.

Hi Sam!
3 tasks
DelayedDue : 12 June, 2025R2
Fabric InhouseGPT WWDR5047_01RaymondsSO-4567
Sales: Monika S. Merch: Praksh
Naimish S Prateek Y+2
On holdDue : 12 June, 2025
Fabric InhouseGPT WWDR5047_02RaymondsSO-4567
Sales: Monika S. Merch: Praksh
Naimish S Prateek Y+2
On TrackDue : 18 June, 2025
Fabric InhouseGPT WWDR4988_03RaymondsSO-4580
Sales: Monika S. Merch: Praksh
Naimish S Prateek Y+2
Hi Sam!
8 tasks
DelayedDue : 12 June, 2025R2
Fabric InhouseGPT WWDR5047_01RaymondsSO-4567
Sales: Monika S. Merch: Praksh
Naimish S Prateek Y+2
On holdDue : 12 June, 2025
Fabric InhouseGPT WWDR5047_02RaymondsSO-4567
Sales: Monika S. Merch: Praksh
Naimish S Prateek Y+2
On TrackDue : 14 June, 2025
CuttingGPT WWDR5051_01Reliance-SHEINSO-4571
Sales: Monika S. Merch: Praksh
Naimish S Prateek Y+2
DelayedDue : 16 June, 2025R1
StitchingGPT WWDR5051_02Reliance-SHEINSO-4571
Sales: Monika S. Merch: Praksh
Naimish S Prateek Y+2
On TrackDue : 18 June, 2025
Fabric InhouseGPT WWDR4988_03RaymondsSO-4580
Sales: Monika S. Merch: Praksh
Naimish S Prateek Y+2
CompletedDue : 20 June, 2025R2
FinishingGPT WWDR5047_01RaymondsSO-4567
Sales: Monika S. Merch: Praksh
Naimish S Prateek Y+2
On holdDue : 21 June, 2025
CuttingGPT WWDR4988_03RaymondsSO-4580
Sales: Monika S. Merch: Praksh
Naimish S Prateek Y+2
On TrackDue : 24 June, 2025
StitchingGPT WWDR5047_02RaymondsSO-4567
Sales: Monika S. Merch: Praksh
Naimish S Prateek Y+2
Hi Sam!
8 tasks
DelayedDue : 12 June, 2025R2
Fabric InhouseGPT WWDR5047_01RaymondsSO-4567
Sales: Monika S. Merch: Praksh
Naimish S Prateek Y+2
On holdDue : 12 June, 2025
Fabric InhouseGPT WWDR5047_02RaymondsSO-4567
Sales: Monika S. Merch: Praksh
Naimish S Prateek Y+2
On TrackDue : 14 June, 2025
CuttingGPT WWDR5051_01Reliance-SHEINSO-4571
Sales: Monika S. Merch: Praksh
Naimish S Prateek Y+2
DelayedDue : 16 June, 2025R1
StitchingGPT WWDR5051_02Reliance-SHEINSO-4571
Sales: Monika S. Merch: Praksh
Naimish S Prateek Y+2
On TrackDue : 18 June, 2025
Fabric InhouseGPT WWDR4988_03RaymondsSO-4580
Sales: Monika S. Merch: Praksh
Naimish S Prateek Y+2
CompletedDue : 20 June, 2025R2
FinishingGPT WWDR5047_01RaymondsSO-4567
Sales: Monika S. Merch: Praksh
Naimish S Prateek Y+2
On holdDue : 21 June, 2025
CuttingGPT WWDR4988_03RaymondsSO-4580
Sales: Monika S. Merch: Praksh
Naimish S Prateek Y+2
On TrackDue : 24 June, 2025
StitchingGPT WWDR5047_02RaymondsSO-4567
Sales: Monika S. Merch: Praksh
Naimish S Prateek Y+2
Role
Product designer: card component, states, filters and factory rollout
Company
ZYOD, fashion-manufacturing ERP
Platform
ZYOD ERP, mobile
Timeline
2024–25
Outcome
100% adoption across 3 factories (2 in Gurgaon, 1 in Jaipur)
100%

adoption in every launch factory

3

factories shipped: 2 Gurgaon, 1 Jaipur

4

production stages tracked: Fabric inhouse, Cutting, Stitching, Finishing

01 The problem

The right tool for a desk. The wrong one for a floor.

ZYOD's TNA (time and action) module tracked every style, stage, delay reason and comment in one large desktop table. It worked for planners at desks. It didn't work for the team leads, fabric chasers and warehouse supervisors who keep production moving, because they stand on the floor all day with no monitor. A late fabric date could be visible at a desk while three later stages were already hit before anyone on the floor knew.

Try it on a phone
Sales > Sales Order Search by SO, brand name, supplier name… Export

Sales Order

TotalItems: 23455 | USD: 4583940.43
GMV BookedQty: 23455 | USD: 4583940.43
GMV InvoicedQty: 23455 | USD: 4583940.43
GMV ActiveQty: 23455 | USD: 4583940.43
Actual date on time/early Actual date later than planned date
TNA ↑Target Dispatch date ↑Current stageActivity det.FitPPFPTSize SetFabric InhouseCuttingStitchingEmbroideryPrintingDyeingWashingFinishingPackingFinal InspectionDispatch
Style: WWDR001_01Brand: RELIANCE-SHEINSO-id: SO-1234
6 Jul, 2024 R2
Fabric InhouseTarget: 1 Jun, 2024 | Late (11d)Depends on: Lab Dip App…go to chat
DaysTarget dateActual date
Late (4d)1 Jun, 2024 R1-
Early (1d)1 Jun, 2024 1 Jun, 2024
On time (11d)1 Jun, 2024 -
—4 Jun, 2024 -
Late (11d)6 Jun, 2024 17 Jun, 2024
—9 Jun, 2024 -
—16 Jun, 2024 -
—20 Jun, 2024 -
Not in route— —
Not in route— —
—24 Jun, 2024 -
—27 Jun, 2024 -
—30 Jun, 2024 -
—2 Jul, 2024 -
—6 Jul, 2024 -
Style: WWTS014_02Brand: RELIANCE-SHEINSO-id: SO-1238
4 Jul, 2024
DaysTarget dateActual date
Late (11d)1 Jun, 2024 R11 Jun, 2024
Early (1d)1 Jun, 2024 1 Jun, 2024
—3 Jun, 2024 -
On time (2d)5 Jun, 2024 5 Jun, 2024
—8 Jun, 2024 -
—11 Jun, 2024 -
—15 Jun, 2024 -
Not in route— —
—18 Jun, 2024 -
—21 Jun, 2024 -
Not in route— —
—25 Jun, 2024 -
—28 Jun, 2024 -
—1 Jul, 2024 -
—4 Jul, 2024 -
Style: WWKD007_01Brand: RELIANCE-SHEINSO-id: SO-1241
2 Jul, 2024 R1
Fabric InhouseTarget: 1 Jun, 2024 | Late (11d)Depends on: Lab Dip App…go to chat
DaysTarget dateActual date
On time (11d)1 Jun, 2024 -
On time (11d)1 Jun, 2024 -
On time (0d)1 Jun, 2024 1 Jun, 2024
—3 Jun, 2024 -
Late (3d)5 Jun, 2024 8 Jun, 2024
—10 Jun, 2024 -
—14 Jun, 2024 -
Not in route— —
Not in route— —
Not in route— —
Not in route— —
—22 Jun, 2024 -
—25 Jun, 2024 -
—28 Jun, 2024 -
—2 Jul, 2024 -
1-20 of 97
The desktop table, the system of record the card had to sit on top of. Coded from the original design with sample data: scroll it sideways to follow a style from sampling to dispatch, or switch to “On a phone” to try shrinking it.
One late fabric dateDrag the line
3stages hit
before anyone knew
Fabric inhouse
Cutting
Stitching
Finishing
Found

Found when someone next opened the table. By then it had moved through three stages.

Illustrative timeline, not measured dates.
For floor teams, the table failed in five waysPick a gap
The gapThey couldn't find their work

A lead with 12 sales orders still had to hunt for them.

What answered itFilters on one shared list: My SOs, Needs attention, Due this week

There were two versions of the truth: the table, which was the system of record, and the floor, which knew what was really happening but couldn't write it down.

Two systems that weren't talkingTry “Add the card”
System of recordThe tableFabric · On trackLast updated at the desk
System of workThe floorFabric · Failed inspectionKnows, but can't write it down
2versions of the truthThe table and the floor aren't talkingNo shared record
Illustrative status values.
Constraints

The TNA dashboard, its core flows and its data model were already designed and locked; a senior designer set the core flows. I owned the card system, its states, the filters and the rollout. My job was to decide what a standing worker needs from that data in the next ten seconds.

02 Who was stuck

Three roles, one floor, different questions.

RoleWhat they needBefore
Team leadWhat's mine, what's red, and what can I escalate without leaving the line? Owns styles across all four stages.Verbal updates and periodic desk checks
Fabric chaserWhere is the fabric, and who do I chase?Knowing status meant physically being there
Warehouse supervisorWhat's arriving, and what's late upstream?Delays arrived as a surprise at the door

These roles came from the brief and how teams already used TNA, not from new interviews. I designed one list for all three jobs instead of three separate apps.

03 Three decisions

A table is a reporting object. A card on the floor is a decision object.

Shrinking the table onto a phone was the obvious move, and I rejected it. Instead I asked one question of every field in the table: does this change what someone does in the next minute? Each field went on one of three shelves: first glance, on the card face, or behind a tap.

03/Information hierarchy

Does this change what someone does in the next minute?

Drag or tap a field

Seven fields from the table. Pick one, then the shelf it belongs on.

Decision 1: Show what changes a decision, hide the rest behind a tap

The card face shows status and due date, style and brand, contacts and assignment, then the latest comment and photo. Revision history and full comment threads sit one tap away.

If a worker has to open every card to see what's urgent, the card has failed.

Decision 2: One shared list with filters, not a private to-do app

A personal “my tasks” app would make people faster at their own list and blind to the line. Delays don't stay inside one department, so everyone works from one shared list and filters it: My SOs, Needs attention, Due this week.

I optimize for the line, not just my list.

Decision 3: Every action lives on the card

Comment, escalate, reassign and attach a photo all happen on the card itself. A separate screen for updates would mean fewer updates, and TNA is only as good as its last update.

If logging a problem takes a second screen, the problem doesn't get logged.

I also kept it as one component for all three factories, so each new factory is a rollout, not a new design project.

04 The solution

A card component that didn't exist in the design system.

I built the card from scratch and dropped it into the existing ERP. Each part answers one question a floor worker asks.

DelayedDue : 12 June, 2025R2
Fabric InhouseGPT WWDR5047_01RaymondsSO-4567
Sales: Monika S. Merch: Praksh
Naimish S Prateek Y+2
On holdDue : 12 June, 2025R2
Fabric InhouseGPT WWDR5047_01RaymondsSO-4567
Sales: Monika S. Merch: Praksh
Naimish S Prateek Y+2
On TrackDue : 12 June, 2025R2
Fabric InhouseGPT WWDR5047_01RaymondsSO-4567
Sales: Monika S. Merch: Praksh
Naimish S Prateek Y+2
CompletedDue : 12 June, 2025R2
Fabric InhouseGPT WWDR5047_01RaymondsSO-4567
Sales: Monika S. Merch: Praksh
Naimish S Prateek Y+2
“What needs my attention right now, standing up?”

Status

  • On track, Needs attention, Delayed, On hold and Completed, with color as the triage layer, not decoration.
On TrackDue : 12 June, 2025R2
Fabric InhouseGPT WWDR5047_01RaymondsSO-4567
Sales: Monika S. Merch: Praksh
Naimish S Prateek Y+2
“Who do I talk to, and why does this card exist?”

Context on the face

  • Style, brand, contacts and assignment, with no second screen for the basics.
Hi Sam!
8 tasks
DelayedDue : 12 June, 2025R2
Fabric InhouseGPT WWDR5047_01RaymondsSO-4567
Sales: Monika S. Merch: Praksh
Naimish S Prateek Y+2
On holdDue : 12 June, 2025
Fabric InhouseGPT WWDR5047_02RaymondsSO-4567
Sales: Monika S. Merch: Praksh
Naimish S Prateek Y+2
On TrackDue : 14 June, 2025
CuttingGPT WWDR5051_01Reliance-SHEINSO-4571
Sales: Monika S. Merch: Praksh
Naimish S Prateek Y+2
DelayedDue : 16 June, 2025R1
StitchingGPT WWDR5051_02Reliance-SHEINSO-4571
Sales: Monika S. Merch: Praksh
Naimish S Prateek Y+2
On TrackDue : 18 June, 2025
Fabric InhouseGPT WWDR4988_03RaymondsSO-4580
Sales: Monika S. Merch: Praksh
Naimish S Prateek Y+2
CompletedDue : 20 June, 2025R2
FinishingGPT WWDR5047_01RaymondsSO-4567
Sales: Monika S. Merch: Praksh
Naimish S Prateek Y+2
On holdDue : 21 June, 2025
CuttingGPT WWDR4988_03RaymondsSO-4580
Sales: Monika S. Merch: Praksh
Naimish S Prateek Y+2
On TrackDue : 24 June, 2025
StitchingGPT WWDR5047_02RaymondsSO-4567
Sales: Monika S. Merch: Praksh
Naimish S Prateek Y+2
“What do I do about it, right here?”

Actions on the card

  • Comment, escalate, reassign, attach a photo. The audit trail starts at the problem, not in an end-of-day recap.
Hi Sam!
3 tasks
DelayedDue : 12 June, 2025R2
Fabric InhouseGPT WWDR5047_01RaymondsSO-4567
Sales: Monika S. Merch: Praksh
Naimish S Prateek Y+2
On holdDue : 12 June, 2025
Fabric InhouseGPT WWDR5047_02RaymondsSO-4567
Sales: Monika S. Merch: Praksh
Naimish S Prateek Y+2
On TrackDue : 18 June, 2025
Fabric InhouseGPT WWDR4988_03RaymondsSO-4580
Sales: Monika S. Merch: Praksh
Naimish S Prateek Y+2
“What's actually mine, right now?”

Filters on a shared list

  • Needs attention, My SOs, Due this week, plus bulk select to escalate, reassign or comment on many delayed cards at once.
A day with the cardStep through it
Open the app

Red and yellow wait under “Needs attention.”

Step 1 of 3

A day with the card: open the app, filter to Needs attention, act on what's red and yellow. The desktop table stays for planners; the card is the execution layer the table was never going to be.

05 Impact

100% adoption is the number I can stand behind.

100%

adoption across the three launch factories

  • GurgaonAdopted
  • GurgaonAdopted
  • JaipurAdopted

All three launch factories adopted the cards: two in Gurgaon and one in Jaipur. People who had no TNA access unless they walked to a desk now track material, fabric and SKU status, coordinate across departments and escalate from their phones.

Before
  • Status lived on a desktop
  • Delays surfaced when someone opened the table
  • Escalation was a call or a walk
After
  • Status is visible and editable from the floor
  • Delays are flagged when they're seen
  • Escalation and photo evidence happen in one motion

Adoption is the only number with hard data behind it. I didn't measure time saved, so I don't claim it.

06 Limits and what's next

What I would not claim.

My scope was the card, its states and its filters. I decided which fields earned a place on a standing worker's first screen, not which fields existed.

  1. 01
    Connectivity. A card that needs a clean network is fragile in parts of the factory.
  2. 02
    Language. An English interface on Gurgaon and Jaipur floors is a real adoption risk as the rollout grows.
  3. 03
    Conflicting status. When a chaser and a lead disagree on a stage, who wins is still unresolved.

The problem was never “make TNA mobile”. The company had a source of truth only one job could use, and production speed depended on the other jobs writing into it.