Work / Case 04 · ZYOD (ERP)

Jobwork completion form

A digital completion record that replaced paper and Excel for job workers, production and finance. 50% fewer manual errors and 30% faster payment approvals.

Edit an underlined number, then mark it complete

Job work completion

JW ID: JW-1456JW Rate/Unit: 21JW Purpose: DyeingSO ID: SO-2146, +3 morePO ID: PO-2146

Finished Goods
Item DetailsProducedSent vs PlannedBalanceReturnedPassed vs Received (QC)RejectedReceived by next JWAction
JW7139STIT0017Dress Stitching
m/ 1,000 m5%30 m 0 m/ 1,050 m4%40 m1,010 m
Raw Materials (3)
Item DetailsReceived vs PlannedPassed vs Received (QC)ConsumedActual vs Planned (Average)Actual vs Planned (Waste)RejectedBalanceReturnedMaterial issuedAction
JW7139FAB0017Cotton poplin
1,155 / 1,100 5%1,130 / 1,155 2% m1.00 / 1 0%/ 3017%25 m0 m m1,100 m
JW7139LIN0017Lining
600 / 600 0%590 / 600 2% m0.57 / 0.5 15%/ 15100%10 m-30 m m600 m
JW7139THR0017Thread
126 / 120 5%126 / 126 0% 0.11 / 0.1 7%/ 450%0 cones8 cones cones120 cones
Role
Product designer, process mapping through UI
Company
ZYOD, fashion-manufacturing ERP, Gurugram
Scope
Completion module: consumption tracking, discrepancy detection, barcodes and return invoices
Users
Job workers, production managers, finance
Timeline
2024–25
Outcome
50% fewer manual errors, 30% faster payment approvals
50%

fewer manual errors

30%

faster payment approvals

01 The problem

A wrong number on the floor becomes a payment that waits.

When outside job workers finish work on a garment order, three teams need to agree on what happened: the job worker, production and finance. They had no shared record. Hand-offs ran on paper, Excel and verbal updates, so each team held its own version of the truth.

One completed job, three versions of itTry “Give them one record”
Reports the jobJob workerExcel: 960 m usedExcel or a verbal update
Owns progressProduction“Probably done?”No consistent view of the job
Releases paymentFinanceWaiting on numbersLate, inconsistent inputs
3versions of the truthPaper, Excel and verbal updatesNo shared record
Illustrative values.

One wrong consumed quantity turned into a stock mismatch, then a quality dispute, then a delayed payment. Four failures compounded: no live picture of the job, updates that were out of date as soon as they were written, approvals that relied on trust, and inventory nobody could see in the moment.

02 Who was stuck

Three teams, one completion event.

RoleWhat they doBefore
Job workerLogs status and material consumedExcel or verbal updates
Production managerOwns progress on the jobNo consistent view of the job
FinanceReleases paymentLate, inconsistent inputs

A form that served only one side would fail: either finance would keep chasing, or the floor wouldn't fill it in.

03 Three decisions

Map material and money before you draw a screen.

Before designing the form, I mapped how material moves, how each number is calculated, and one reporting model all three teams could share. The question underneath everything was: what must be true before a job can be marked complete, and who is allowed to undo it?

Three maps before one screenStep through it
Material movement

Raw material in, finished goods out, and every hand-off between.

Step 1 of 4

Decision 1: One record for planned, consumed and returned

Planned, consumed and returned material sit on one inventory journey, and consumption is always entered against the plan. Without a baseline, a consumption number just recreates Excel.

A number only means something next to the number it should have been.

Decision 2: Put the discrepancy in the row

Every line shows the percentage gap between planned and actual, updated live and color-coded: up to 5% is on plan, up to 10% means take a look, over 10% needs a conversation. Production and finance see the same signal at the same time.

Jobwork completion · Cotton poplinDrag the sliderIn progress
Planned1,000 m
Consumed960 m
Left to return40 m
Off plan−4.0%
Worth a look

Drag the slider. The badge does the math so nobody has to.

Illustrative prototype with sample data.

Make the problem visible where the work is, not in a report afterwards.

Decision 3: Completion can be undone, honestly

A job can be marked complete, and that completion can be revoked. Completion triggers payment, so mistakes need a clear, recorded way back instead of a quiet edit.

If a decision moves money, it needs an honest undo.

04 The solution

Five parts, one completion record.

Edit an underlined number
Finished Goods
Item DetailsProducedSent vs PlannedBalanceReturnedPassed vs Received (QC)RejectedReceived by next JWAction
JW7139STIT0017Dress Stitching
m/ 1,000 m5%30 m 0 m/ 1,050 m4%40 m1,010 m
“What actually moved, in one place?”

Data consolidation

  • Planned, consumed and returned material on one inventory journey.
Change what was consumed
Raw Materials (3)
Item DetailsReceived vs PlannedPassed vs Received (QC)ConsumedActual vs Planned (Average)Actual vs Planned (Waste)RejectedBalanceReturnedMaterial issuedAction
JW7139FAB0017Cotton poplin
1,155 / 1,100 5%1,130 / 1,155 2% m1.00 / 1 0%/ 3017%25 m0 m m1,100 m
JW7139LIN0017Lining
600 / 600 0%590 / 600 2% m0.57 / 0.5 15%/ 15100%10 m-30 m m600 m
JW7139THR0017Thread
126 / 120 5%126 / 126 0% 0.11 / 0.1 7%/ 450%0 cones8 cones cones120 cones
“What did a job worker actually use?”

Consumption entry

  • Actual use logged against the plan.
Mark it complete, then revoke it

Job work completion

JW ID: JW-1456JW Rate/Unit: 21JW Purpose: DyeingSO ID: SO-2146, +3 morePO ID: PO-2146

Finished Goods
Item DetailsProducedSent vs PlannedBalanceReturnedPassed vs Received (QC)RejectedReceived by next JWAction
JW7139STIT0017Dress Stitching
m/ 1,000 m5%30 m 0 m/ 1,050 m4%40 m1,010 m
“What if something needs correcting?”

Complete and revoke

  • Mark a job complete, or reverse it with a record of why.
Push a number off plan
Raw Materials (3)
≤ 5% on plan≤ 10% take a look> 10% needs a conversation
Item DetailsConsumedActual vs Planned (Average)Actual vs Planned (Waste)RejectedBalance
JW7139FAB0017Cotton poplin
m1.00 / 1 0%/ 3017%25 m0 m
JW7139LIN0017Lining
m0.57 / 0.5 15%/ 15100%10 m-30 m
JW7139THR0017Thread
0.11 / 0.1 7%/ 450%0 cones8 cones
“How far off is this from the plan?”

Discrepancy badges

  • Live, color-coded gaps between plan and actual.
“Where does this material go next?”

Barcode and return invoice

  • Finished goods get a barcode tied to inventory, and extra raw material goes back with a generated return invoice.

05 Impact

Two numbers I will stand on.

50%

fewer manual errors

30%

faster payment approvals

Manual errors fell by 50% (indexed: 100 before, 50 after) and payment approvals got 30% faster (indexed: 100 before, 70 after). Job workers, production and finance now see the same job at the same time. I'm not adding more numbers until there's real data behind them.

06 Limits and what's next

What I would not claim.

My scope was the completion module, not inventory or finance as a whole. Open questions:

  1. Who wins when a red discrepancy is disputed, and should payment wait?
  2. Can consumption be logged where the floor has no connectivity?
  3. How should the logic behave across several vendors or quality passes?